HONGYANG GROUP Libya Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP Libya Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

U314 Automatic Nozzle

U314

U314 Automatic Nozzle

U314 Automatic nozzles are designed with today's customer in mind. Small, trim, light weight, easy and convenient to use. It is a rugged performer that offers long life and reliable service.

Warning

Use foreign objects to hold open automatic nozzles could result in failure to shut-off and personal injury.

Materials:

Body: Aluminum

seals: Buna-N, Viton

Main stem seals: Viton Cased Oil Seal / Graphite with Teflon

Main stem: Stainless steel

Color of insulator :

Red Green Blue Yellow Black

Features :

U314-A/C/E/G Flow rate: 0-45 L/m ( (13/16")

U314-B/D/F/H Flow rate: 0-70 L/m (15/16")

Working Pressure: 0.18Mpa

Compound Main valve and bleed poppet

Tight structure, attractive appearance. Minimum pressure Loss and

offer a maximum flow rate

Accurate flow control-

It allows customers to top off their tank to the exact amount that they

want , and it's easy to stop gasoline flow precisely.

Easily replaced rotar y 360 swivel- prevents the hose

from curling up.

Hold-open rack is available for full service applications.

The one hand control means easy setting to flow rate for customer's convenience.

Spout with gear: Making it to be holding on the spout of tank

without hand, improving your efficiency.

Flow-lock: designed to shut-off automatically when the spout is

tripped up, limiting spillage, avoiding accident.

Hand insulator- protect both nozzle and vehicle, and insulates

users' hands.

Available Colors- color chart on inside back cover

Selective splash guard.

100% Factory Tested

Replacement Parts:

Key Description

1 Spout 13/16" & Spout 15/16"

2 Full hand insulator

3 Lever-Guard Lever Assembly

4 Diaphragm Assembly

5 Vac Cap

6 Main Valve

7 Swivel BSPT3/4" & NPT3/4" & BSPT1" & NPT1"

Package:

Net Weight Cross Weight Dimension

18.75kg/case of 15 22kg/case of 15 55x34x42.5cm/case of 15

products links

links

technical archives

    nut 2-Gasket 3-Nut 4-Jointer 5-Spring seat 6-Spring 7-Overflow valve core 8-Valve seat 9-O-ring 10-Nut 1 fuel dispenser 1-Washer 12-Bolt 13-Elastic gasket 14-V-wheel 15-V-belt board 16-Pressure plate 17-Framework oil seal 18-Bolt 19-Elastic washer 20-Pump cover 21-Sliding bearing 22-Rotor unit 23-Woodruff key 24-Vane 25-Spring flake 26-Sliding bearing 27-Plug 28-O-ring 29-Pump body 30-Nut 31-Flat washer 32-Gaslet 33-Bolt 34-Adjusting bolt Diagram 2-2: Exploded drawing of vane pump Diagram 2-3: Installation of rotor of vane pump Diagram 2-4 show the pump’s working situation. A Section and B Section are the neared vane, which rotate together with rotor clockwise. The turning Vane A increases the cubage of low pressure transitional area, oil being sucked into pump. Fuel between vane A and Vane B is brought to high pressure transitional area as the vane go around clockwise. In high pressure transitional area cubage become smaller because of vane rotation, as result, oil is impelled out under the vane pressure. When rotor turns continually oil in tank is sucked into pump and then discharged out ceaselessly to form a stable flowage. Pump flowage formula is showed in Diagram 2-1. Diagram 2-4: Vane sketch map Q = 2e (Πd-SZ) bnη (2-1) In the formula: Q ── actual flux e ── eccentric moment D ── diameter of chamber b ── vane height S ── vane thickness n ── rotate speed of rotor Z ── vane number η ── volume efficiency Taking security for granted GB50156-2002 of The Regulation of design and construction on vehicle gas & fuel filing station stipulates that the outlet flow-rate of fuel dispenser don’t exceed 60L/min. Overflow valve The real flow rate of vane pump surpass 60L/min. the redundant flowage back into the inlet of pump via overflow valve to make the outlet flow rate don’t exceed 60L/min. Vane pump can adjust flowage as it belongs to ration pump. When increasing fuel dispenser’s flowage openness of nozzle is enlarged, outlet pressure of pu fuel dispenser fuel dispenser

technical specification

    mber the first meeting of the Techni-  The work of the DKD experts body has made   fuel dispenser cal Committee abroad took place in Chile in  a positive contribution to maintaining the   order to give DKD-accredited laboratories in  close relations between the PTB and the DKD.   South America the opportunity to exchange   technical information.  In the year under report reorientation to the  new standard DIN EN ISOIEC 17025 for   In contrast to other accreditation bodies  accredited calibration laboratories has largely   which in many cases have reached saturation  been completed. 96 % of the laboratories has   the demand for DKD accreditation is unbro-  meanwhile been accredited in accordance   ken. In view of the increasing shortage of  with this new standard. Only in the case of a   resources it is thought about simplifying the  few laboratories has accreditation been with-   accreditation processes and increasing the  drawn.   employment of external experts to be able to   act on a global scale also in the future.   146   libration   Tasks of the DKD within the PTB Against the background of the globalization   of the strongly export-oriented German   In Germany the PTB will also in future be the   fuel dispenser fuel dispenser

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    wants them. Meanwhile, both sides want more weapons. © 2006 . fuel dispenser About sponsorship The Democratic Republic of Congo Election fever Jul 27th 2006 | KINSHASA From The Economist print edition Staggering towards a date with destiny IT WAS never going to be easy, but even so the last week ahead of Congo s historic elections has been rough. Influential Catholics warned that they may not accept the results of the poll; riots rocked Kinshasa, the capital; more civilians were killed in the lawless east; and a stone-throwing crowd jeered President Joseph Kabila as he arrived to campaign in a southern opposition stronghold. But, with a few days to go, it seemed as though things would just about hold together enough for the poll to take place, as planned, on July 30th. The Congolese should be able to choose their leaders freely for the first time in over 40 years. AFP Vote for the winner It will not be perfect by a long way; there have been too many glitches, too many accusations of intimidation and vote-rigging, for that. A simmering row over why quite so many spare ballot papers?m of them—have been printed, on top of the 26m required for those registered to vote, will not go away. Pessimists fear the extra ballots will be used to rig the vote. The electoral commission, however, says they will be used only to replace those lost or destroyed, and can be tracked. News that the details of about 1.3m voters have gone missing and that their names will not be on the register on voting day has gone down badly too. Organisers say they will be able to let these people vote, but such problems will fuel mistrust in the official results. Catholic leaders told worshippers in packed churches in Kinshasa on July 23rd, the Sunday before the poll, that they should boycott it if such issues cann fuel dispenser fuel dispenser