HONGYANG GROUP Libya Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP Libya Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

D-GA4Q FUEL DISPENSER

D-GA4Q

D-GA4Q FUEL DISPENSER

FlowMeter Type : Optional

Accuracy :±0.2%

Pressure Loss (kg/cm) :Under 0.25

Motor Voltage(V) :110V/220V/380V,50Hz/60Hz

Capacity(hp) :1HP(0.75kw)

Input Voltage : 110V/220V/380V,50Hz/60Hz

Nozzle : Auto Shut-off Nozzle

Environmental Condition :-40~~+55degree

Control Type : Solenold Vale Control Type

Preset : Function Provided(Small LCDIndicator)

Display(Counter) :Type LCD and Bright Backlight

Digit of Volume : 0~~999,999(6 Digits),Decimal point can be changed

Digit of Amount :0~~999,999(6 Digits),Decimal point can be changed

Digit of Unit price : 0~~9999(4 Digits),Decimal point can be changed

Digit of Total Range : 0~~99,999,999,99

Optional Display Type LCD and Bright Backlight

Digit of Volume: 0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Amount :0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Unit price : 0~~999999(6 Digits),Decimal point can be changed

Digit of Total Range : 0~~99,999,999,99

Totalizer :1~~9,999,999

Hose :4.5m

Weight: 310kg.

Dimension(L×W×H) : 900*620*2180(mm)

Dimension(L×W×H)Of Qty of Container: 40ft: 45 20ft: 22

products links

links

technical archives

    g proof of filling station including awning mostly adopt lightningproof belt based on lightning condition of building and construction. It would be more economical. Metal pipe and line that connected indoors possibly generate spark and ignite vapor in som fuel dispenser e intervals of them as being attacked by direct lightning and lightning induction, resulting in explosion or fire. Thereby, this item of regulations is necessary. According to testing the burring length exceeding 50m at outdoors or 100m indoors or at least two grounding points with no more than 20 in lead pipe will largely reduce high electric potential indoors. Article II Wiring system The power load degree in filling station is Class III. Power supply adopts 380V/220V in station. Mini internal-combustion generator is adopted as power supply. Its exhaust pipe mounts exhausting fire-resistance fuel dispenser device. Horizontal distance from exhaust pipe to each explosion area should comply with the stipulation: if exhaust outlet under 4.5m ground the distance no less than 5m; fuel dispenser if high than 4.5m, the distance no less than 3m. Electric line in filling station should adopt cable and burry, using steel pipe as line through vehicle road. If there are many lines a cable tunnel is suggested to use, filling with sand, exclusive other pipes. Article III Earth wire and grounding system The steel tank used for storing Class A oil should mount static-proof grounding device. The lightning conductor similarly used for this function. The starting and end point of delivery pipeline in tunnel or at ground should set static-proof and lightning induction device, grounding resistance no more than 30Ω. The vehicle tank discharge area in filling station should set static-proof grounding device, resistance no more than 100Ω. The design of static—proof grounding in forecourt should comply with the relevant stipulation of current national standard The Design and construction of forecourt. Article IV Vapor-Recovery system Along with the number of vehicle and filling stati

technical specification

    rs   may require flow to be enabled through all available   nozzles by default others may restrict flow to specific   nozzles by default.  June 2005 IFSF - STANDARD FORECOURT PROTOCOL fuel dispenser FP31_2.21   DISPENSER APPLICATION   Page: 105   FUELLING POINT DATABASE   DB_Ad = FP_ID (21H-24H)   Data Field Type ReadWrite MO   Data Element Name   Description   _Id (Value) in State   fuel dispenser 51 Volume R(1-9) O   Local_Vol_Preset   (33H) Allows the FP to infor fuel dispenser m the CD about a change to the   local volume preset.   The volume preset is reset to 0 after the current fuelling   transaction is stored in the transaction buffer.   PCD Comment:   As this is an optional data field the PCD can NAK any   write requests to this Data_Id with a Data_ACK code of 4   (Data does not exist in this device) or reply to any read   request with an answer message with the respective   Data_Id s length set to 0.   52 Amount R(1-9) O   Local_Amount_Prepay   Allows the FP to inform the CD about a change to the   (34H)   local amount prepay.   The amount prepay is reset to 0 after the current fuelling   transaction is stored in the transaction buffer.

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    city folk have forgotten about them. © 2006 . About sponsorship Nepal Poised between revolutions? Aug 24th 2006 | KATHMANDU From The Economist print edition Having successfully ousted a fuel dispenser king, Nepal is still looking for peace JUST four months after huge demonstrations forced King Gyanendra to relinquish absolute power, protest has become a way of life in Nepal. Its latest success came on August 20th, when, after violent demonstrations in Kathmandu and elsewhere, the government rescinded its attempt to raise the prices of kerosene, diesel and petrol. Unfortunately, the goal that motivated many to join the original revolt earlier this year is proving harder to reach a lasting peace in the ten-year civil war with Maoist insurgents. fuel dispenser AP Prachanda the potential Octobrist Still, it seems tantalisingly close. The Maoists are obser fuel dispenser ving a ceasefire, and in June agreed to join an interim government with the seven-party alliance of democratic parties that backs Girija Prasad Koirala, the prime minister. There would then be elections—as early as next April—to an assembly to draft a new constitution. This month the Maoists accepted that their fighters would be confined to cantonments, where the United Nations would monitor them. The government s army would be confined to its barracks. A beefed-up United Nations presence, to be led by Ian Martin, a veteran of the transition in East Timor, and now head of a much-praised UN human-rights operation in Nepal, is to be announced shortly. Every element of this seemingly neat arrangement, however, is uncertain. The parties, for example, are loth to let the Maoists join the government until they have disarmed. But so far they have not even agreed to be separated from their weapons in the cantonments. “Unless and until this reactionary, cruel, ruthless royal army is disb